MUSCAT

MALL OF OMAN

Awarded Commercial Project of the Year in 2017, The 137,000M2 retail space is a tribute to design and development in BIM. BIM was adopted by lead consultant AECOM from concept to completion ensuring total design coordination and assisting with the procurement process.

Hadley Industries FZE SFS BIM objects were used for the design of the continuous high-bay walling. Assisted by Hadley in-house engineering team.

3,150M2 of continuous walling is installed at the site. Selected for the speed of erection and certified quality of Hadley UltraSteel.

 

3,150M2 of Hadley continuous walling

Speedy erection

Reduced project programme

ASTM Certified, ACDC approved

Two hour fire performance

Improved acoustic properties

SUBSTANTIAL TIME AND COST SAVINGS

There is a significant saving in Main Contractor Time Related Preliminaries when using The Hadley Steel Frame compared to traditional blockwork. The magnitude of this potential cost saving is largely driven by a shorter overall construction duration.